44 Taharoto and 9 Karaka

Chillex were tasked with assisting Health NZ with the HVAC retrofit of their Takapuna buildings. A single chiller served both buildings by supplying water underground to number 9 which proposed a unique challenge, but not one that we weren’t able to overcome.

Given the buildings were required to remain tenanted and operational during the whole process, we enlisted the help of Aggreko and their temporary chillers. This was a seamless process where we decommissioned the old chiller, installed the temporary chillers, then changed these out for the new BDT systems.

Until the controls systems were fully in place, Chillex Maintenance were instrumental in liaising with Health NZ to ensure the supply temperatures of the indoor systems met the needs of the tenants.